Table 10. Individual spatial change in Hangang Park in Yeouido (code)

Spatial name(year) Space creation(interection, modality) Space creation process and method(structure) Change and extinction of space Final code
Sport fields and ground (75) Sport space for national assembly staff National assembly funding Transform by comprehensive plan a2-D-Ⅱ-b2
a2 D b2
Expansion of sport facilities (football, volleyball, baseball, basketball, tennis)(81) A phenomenon of lack of apartment recreation space Government funding for plan Transform by omprehensive plan a1-B-Ⅱ-b2
a1 B b2
The cruise marina (86) Planed as a comprehensive development plan Execute plan for entire space No change b2-C-Ⅰ-b2
b2 C b2
Lawn square(86) Planed as a comprehensive development plan Execute plan for entire spac Space development b2-C-Ⅰ-b2
b2 C b2
Sport facilities(footvall, voellyball, baseball) (86) Space was being shared according to demand. Modify by each sport space plan Demolish or construction to demand a2-D-Ⅱ-a1
a2 D a1
Outdoor swimming pool (91) Prohibit free swimming in the Hangang river Execute individual space plan Space movement a1-A-Ⅱ-a2
a1 A a2
Nature learning zone, Flower garden area(90년대) Environmental pollution, juvenile delinquency Problem Develope the prairie to garden and square Remove from renaissance plan b1-B-Ⅱ-b2
b1 B b2
Full course marathon track (02) Increase of Marathon event Develope the main access route as the full course Transform from Renaissance plan a1-D-Ⅱ-b2
a1 D b2
Riverside sandy beach (04) Public business plan Execute individual space plan Remove from Renaissance plan b2-C-Ⅱ-b2
b2 C b2
Inline skating track (04) Need Inline course with growing activities Execute plan for entire space Move from Renaissance plan a2-D-I-b2
a2 D I b2
Park golf course (04) Golf popularization, park golf form development Execute individual space plan No change b2-B-Ⅱ-b2
b2 B b2
Event plaza, seasonal plaza, urban terrace(07) Increase of large-scale visitors as events and festivals Renaissance plan change the existing space design No change a1-C-Ⅰ-a1
a1 C a1
Water square (07) Development waterfront space Renaissance plan change the Waster front space No change b2-C-Ⅰ-a1
b2 C a1
Traditional square and wrestling field (07) Development traditional square Renaissance plan change the existing space design No change b2-C-Ⅰ-b1
b2 C b1
Muti-sport field, soccer field(07) Space relocation by leisure activities Renaissance plan move  the existing space No change a1-D-Ⅰ-a1
a1 D a1
Water light stage, multi plaza(07) Encouraging cultural behavior Renaissance plan develop new project No change b2-C-Ⅰ-a1
b2 C a1