Table 4. Comparison between observed and simulated runoff results

Runoff in vegetation unit-type LID system
Experimental group Control group
Observed avg. (/hr) 0.32 0.70
Simulated avg. (/hr) 0.22 0.58
O/S 1.44 1.21
Dv 30.35 17.27
NSE 0.36 0.78
RMSE 0.21 0.34