Project name | Repair work of Whang-hak-jung | Business expense | ₩79,684,000 | |
---|---|---|---|---|
Curtural heritage name | Whang-hak-jung | |||
Cultural heritage type | Tangible cultural heritage | Seoul Tangible Cultural Heritages No. 25 (Specified on January 15, 1974) | ||
Location | 15-32 Sajik Road 9, Jongno-gu, Seoul(Sajik-dong) | |||
Construction contents | Roof construction | - Tile selection(tile replacement rate: 20% of concave and 10% of convex) | ||
Earth works & subsidiary construction | After disassembly of base floor T=100mm on gravel compaction T=100mm mud lime compaction PE rainwater catcher(410×510×H750, Installation of granite cover) Ø 300 Double wall pipe installation (L=6m) | |||
Mason | Re-installation after dismantling left side, back side of base Floor granite drainage and granite stair installation Left side mortar demolished part Granite stones and granite flagstone installed Installation of Suknujo in frontal granite ston Re-installation after dismantling of frontal granite for installation of Suknujo | |||
Window construction | Replace the front door(6 pairs in total) Applying paper on the front door Replacement of lost window hardware Installation of anti-skid muzzle | |||
Dancheong | Painting by old base color after wiping a thin grate window painting by old base color on incomplete section All wood oil stain 2 times | |||
Subsidiary construction | Dismantling of cement mortar by drainage and demolition of corrugated pipe (Ø 300) Dredging in drainage Re-installation of steel railings after demolition (3 spans) dismantling and re-installation Julyeon(8 places) |